The implementation is not as easy as as it looks ..The 45mm squared box stuff becomes a 42 m high exit for steam on Thermal Power Stations. The walkup to the vocational training couldn't have been more spicy and juicy .Well i shall save the same for some other time . Its NTPC time now.
3 days of lectures on various aspects.its more like a cocktail .Add A huge amount of Electrical Engg , A few pints of Mechanical Engg ,Add some IT stuff ..Construction by Civil Guys can never be under estimated( the ice on my cocktail) ,even of they are i would not let that happen .Though I cant really possibly ell you how much I grasped through my multi disciplinary acumen.However I can tell you that even though the RC,LC circuits looked a little far off now a days I did manage to pen down few civil engg stuff and I couldn't help but smile as broad as I can every time the word"Construction " used to pop up in the lectures,though the frequency was as low as that of Microwaves.
The preparation to the power plant visit was like preparing you for a battle at the front post.The security gears,a 45 mins movie based on real life experiences of workers in the NTPC plant.Life is pretty colorful if you have to wake at 6 am , a 2 hr drive to the plant ,churn yourself the whole day and then another 2 hrs and finally home at 6:45.Funny for the last 2 days I have been reaching exactly at 6:45.
Few saving graces would that much awaited call at the lunch hour.
There is one subject where I have pondering a lot over it could in a line could be elaborated as "Locational Disadvantage of the NITs".
Its 9:15pm time to wrap up and sleep .Work calls at 6 am ..
Thursday, June 12, 2008
Afterall work calls @ 6am
Posted by Sandeep Taterway at 8:22 AM 0 comments
Subscribe to:
Posts (Atom)